“Rooms Tbilisi” Hotel 2015 Challenges: ❖ Was simple, nice project, without special challenge. Works done: ◆ Fire detection System: – Smoke and heat detectors; – Canal airduct smoke detectors; – fire alarm buttons; – FCP with remote control panel; – დამწნეხი და ბოლის გამწოვი ვენტილატორები; – smoke exhaust dampers; – 8 fire zone separation doors […]
Blog Grid
- Home
- Blog Grid
“Kabadoni” hotel-Sighnaghi 2014 Challenges: ❖ Was simple, nice project, without special challenge. Works performed: ◆ HVAC Automation System: – AHUs – 9000m3 each, equipped with DDC controllers – Installation of control system; – Startup and commissioning; Related projects სასტუმრო “რუმს ყაზბეგი“ „ევროპაბეთის“ ადმინისტრაციული და ქოლ ცენტრი „ჯო ენის საუნივერსიტეტო ჰოსპიტალი“
“Lanceti” Hospital 2014 Challenges: ❖ Was simple, nice project, without special challenge. Works performed: ◆ HVAC Automation System: – AHUs – 8000m 3each, equipped with DDC controllers; – BACnet MSTP communication network; – Centralized operator workstation, with BAS front end; Related projects სასტუმრო „რადიუსი თბილისი“ „ჯო ენის საუნივერსიტეტო ჰოსპიტალი“ სასტუმრო „ეპიზოდი“
East Point Sopping Center -Tbilisi 2014 Challenges: ❖ Establish single BACnet IP automation network, for 4 blocks of the shopping center; Works performed: ◆ Building Automation System. Automation of. Automation of: -AHUs, RTUs, FCUs, exhaust fans; – Water boilers, 1,5MW each; – Hot water circulation plant on 15 pumps, 12 motorized valves; – DHW production […]
“112 Public Safety command Center” Tbilisi 2012 Challenges: ❖ Fire detection system installation for closed technical premises, which is almost half the system and is rough environment; ❖ Automation of building support devices – gensets, chillers, boilers, etc., located nearby, establishing shared communication network, based on BACnet protocol; Works performed: ◆ Fire detection System: – […]
Hotel Rooms Kazbegi – Stepantsminda 2012 ◆ Fire detection System: – Smoke and heat detectors; – Manual call points; – In/Out modules; – strobe/sirens; ◆ Smoke control system: – Fire dampers; – Smoke dampers; – Smoke exhaust fans; – Pressurization fans ◆ Voice evacuation system: -Loudspeakers; – Power amplifiers; – Audio control module; ◆ Assembling […]