“Rooms Tbilisi” Hotel

“Rooms Tbilisi” Hotel 2015

Challenges:

❖ Was simple, nice project, without special challenge.

Works done:

◆ Fire detection System:

– Smoke and heat detectors;

– Canal airduct smoke detectors;

– fire alarm buttons;

– FCP with remote control panel;

– დამწნეხი და ბოლის გამწოვი ვენტილატორები;

– smoke exhaust dampers;

– 8 fire zone separation doors

– Boiler room CO leakage detection;

◆ Voice evacuation system:

– Loudspeakers

– 2 power amplifiers;

– Audio control module;

– Enunciation panel;

◆ Building Automation System. Automation of. Automation of:

– HVAC – AHUs, FCUs;

– DHW plant control;

– Water pressurization station – 3 pumps;

– General and Fire suppression water reservoir control and monitoring;

  • – General exhaust fans;

– Electrical main distribution plant monitoring;

– Fire suppression plant monitoring;

– Disabled person call system:

– call stations;

– Call control panel