Axis Towers – Tbilisi

Axis Towers – Tbilisi 2021-2022 Challenges: ❖ Firemen smoke control system with auxiliary override panel – supporting firefighting staff to intervene in smoke control logic, in critical situations, enhancing life safety level for building inhabitants; ❖ Heating and chilled water plant capacity control, for advanced energy saving level. Works performed: ◆ Building Automation System. Automation […]

“Stamba” hotel and coworking center

“Stamba” hotel and coworking center – Tbilisi 2019-2024 Challenges: ❖ Coworking space temperature and air quality control system – 60 VAV terminals, 70 temperature and Carbon dioxide (CO2) transducers and AHU is connected to one, centralized monitoring and control center, for safe, stable, comfortable and energy saving operation of the building. Complete fast compensation of […]

“City Mall Saburatalo”

“City Mall Saburatalo” – Tbilisi 2019 Challenges: ❖ Was simple, nice project, without special challenge. Works performed: ◆ HVAC Automation System: – AHUs – 12000m3 each, equipped with DDC controllers; – Installation of control system; – Startup and commissioning; Related projects სასტუმრო და „ქოვორქინგი“ „სტამბა“ სასტუმრო „რადიუსი თბილისი“ 112 საზოგადოებრივი უსაფხთხოების მართვის ცენტრი

“Twenties” hotel

“Episode Tbilisi” hotel 2022 Challenges: ❖ Was simple, nice project, without special challenge. Works performed: ◆ Fire detection System: – Smoke and heat detectors; – Manual call points; – FCP with remote control panel; – 2 fire zone separation doors; ◆ Voice evacuation system: – Loudspeakers; – Power amplifiers; – Audio control module; – Enunciation […]

“Rooms Kokhta” hotel

“Rooms Kokhta” hotel – Bakuriani 2019 Challenges: ❖ Was simple, nice project, without special challenge. Works performed: ◆ Fire detection System: – Smoke and heat detectors; – Canal airduct smoke detectors; – Manual call points; – FCP with remote control panel; – 4 fire zone separation doors; ◆ Disabled person call system: – call stations; […]

“Radius Tbilisi” hotel

“Radius Tbilisi” hotel 2019 Challenges: ❖ Hotel VRV system integration in Building Automation System – Guestroom occupancy control and 120 VRV indoor unit occupied/unoccupied control, based on card holder status, for advanced energy saving and comfort level. Works performed: ◆ Fire detection System: – Smoke and heat detectors; – Canal airduct smoke detectors; – Manual […]