Trade center “Galleria Tbilisi”

Trade center “Galleria Tbilisi” 2019 Challenges: ❖ Car park CO monitoring and control system – precise carbon monoxide sampling and integration with ventilation system; Works performed: ◆ Building Automation System. Automation of. Automation of: – Ventilation system –AHU’s; – Water boiler plant – NG water boilers, 1.5MW each; – Chiller plant; – DHW plant; -Water […]

Bioli resort – Kojori

Bioli resort – Kojori 2019 Challenges: ❖ Guest cottage HVAC system automation, ultimate level of energy efficiency; ❖ Giant vitrage door lift & down safety control; Works performed: ◆ Building Automation System. Automation of: – HVAC – AHUs, FCUs, floor heating zones, exhaust fans; – Lights – light control system for event hall; – Vitrage […]

“Jo Ann University Hospital”

“Jo Ann University Hospital” – Tbilisi 2017 Challenges: ❖ Design, supply, install, startup and commission of control system for 16 AHUs, was moderate challenge project. Works performed: ◆ HVAC Automation System: – AHUs – 10000m3 each, equipped with DDC controllers; – BACnet MSTP communication network; – Centralized operator workstation, with BAS front end; Related projects […]

“Hospital Evex” Kavtaradze branch

“Hospital Evex” Kavtaradze branch Challenges: ❖ Was simple, nice project, without special challenge. Works performed: ◆ HVAC Automation System: – AHUs – 10000m3 each, equipped with DDC controllers; – BACnet MSTP communication network; – Centralized operator workstation, with BAS front end; Related projects საქართველოს შინაგან საქმეთა სამინისტრო ტკბილეულის საწარმო „ბარამბო“ საქართველოს იუსტიციის სამინისტრო

“Meama” coffee factory

“Meama” coffee factory Challenges: ❖ Was simple, nice project, without special challenge. Works performed: ◆ HVAC Automation System: – NG Boilers, 500KW each; – Air to water Chillers, 200KW each; – DHW plant – Boilers, 1500L each; – Hot water circulation plant – 14 pumps; – Heating water circulation plant; Related projects სავაჭრო ცენტრი „ისთ […]

Uncategorized

“Hilton Batumi” Casino and administration offices

“Hilton Batumi” Casino and administration offices 2015 Challenges: ❖ VAV based, casino space temperature control system, with advanced algorithm, maintaining space temperature and air quality, for comfortable climate support. Works performed: ◆ HVAC Automation System: – Casino space temperature control, via VAV system; – Office spaces HVAC system monitoring and control; – AHUs, with VAV, […]