“Radius Tbilisi” hotel

“Radius Tbilisi” hotel 2019

Challenges:

❖ Hotel VRV system integration in Building Automation System – Guestroom occupancy control and 120 VRV indoor unit occupied/unoccupied control, based on card holder status, for advanced energy saving and comfort level.

Works performed:

◆ Fire detection System:

– Smoke and heat detectors;

– Canal airduct smoke detectors;

– Manual call points;

– FCP with remote control panel;

– Pressurization, Smoke exhaust fans;

– Smoke exhaust dampers;

– 4 fire zone separation doors;

– Fire curtain;

– Boiler room NG and CO leakage detection subsystem;

◆ Voice evacuation system:

– ceiling speaker;

– Power amplifiers;

– Audio control module;

– Enunciation panel;

◆ Building Automation System. Automation of. Automation of:

– HVAC – AHUs, indoor VRV units;

– DHW plant control;

– Water pressurization station;

– General and Fire suppression water reservoir control and monitoring;

– General exhaust fans;

– Fire suppression plant monitoring;

◆ Disabled person call system:

– call stations;

– Call control panel;