“Kabadoni” Hotel

“Kabadoni” hotel-Sighnaghi 2014

Challenges:

❖ Was simple, nice project, without special challenge.

Works performed:

◆ HVAC Automation System:

AHUs – 9000m3 each, equipped with DDC controllers

Installation of control system;

Startup and commissioning;