Trade center “Galleria Tbilisi”

Trade center “Galleria Tbilisi” 2019

Challenges:

❖ Car park CO monitoring and control system – precise carbon monoxide sampling and integration with ventilation system;

Works performed:

◆ Building Automation System. Automation of. Automation of:

– Ventilation system –AHU’s;

– Water boiler plant – NG water boilers, 1.5MW each;

– Chiller plant;

– DHW plant;

-Water circulation and pressurization plants/stations ;

– Water reservoir system – DW and fire suppression reservoirs;

– Fire suppression stations, Pumps;

– VRF systems;

– Car parking CO control system;

– Elevator monitoring system;

Fire detection System:

– Smoke and heat detectors;

– Canal airduct smoke detectors;

– Beam detection subsystem;

– Manual call points;

◆ Voice evacuation system:

– Ceiling and wall speakers;

– power amplifiers;

– Audio control module;

◆ Electricity and water metering system: -Electricity and water metering system, on 60 users, with centralized management.