Trade center “Galleria Tbilisi”
Trade center “Galleria Tbilisi” 2019
Challenges:
❖ Car park CO monitoring and control system – precise carbon monoxide sampling and integration with ventilation system;
Works performed:
◆ Building Automation System. Automation of. Automation of:
► Ventilation system – 15 AHU’s;
► Water boiler plant – 3 NG water boilers, 1.5MW each;
►Chiller plant – 4 air to water chillers, 600 KW each;
► DHW plant – 2 water boilers, 1000 liter each; each;
► Water circulation and pressurization plants/stations – 30 pumps;
► Water reservoir system – DW and fire suppression reservoirs;
► Fire suppression pump station;
►2 VRF systems;
►Car parking CO control system;
► Elevator monitoring system;
◆ Fire detection System:
►600 smoke and heat detector;
► 15 canal airduct smoke detectors;
► 4 beam detection system;
► 95 manual call points;
◆ Voice evacuation system:
►350 ceiling and wall speakers;
► 6 power amplifiers;
► Audio control module;
◆ Electricity and water metering system: -Electricity and water metering system, on 60 users, with centralized management.