“Rooms Tbilisi” Hotel

“Rooms Tbilisi” Hotel 2015

Challenges:

❖ Was simple, nice project, without special challenge.

Works done:

◆ Fire detection System:

Smoke and heat detectors;

Canal airduct smoke detectors;

fire alarm buttons;

FCP with remote control panel;

დამწნეხი და ბოლის გამწოვი ვენტილატორები;

smoke exhaust dampers;

8 fire zone separation doors

Boiler room CO leakage detection;

◆ Voice evacuation system:

Loudspeakers

2 power amplifiers;

Audio control module;

Enunciation panel;

◆ Building Automation System. Automation of. Automation of:

HVAC – AHUs, FCUs;

DHW plant control;

Water pressurization station – 3 pumps;

General and Fire suppression water reservoir control and monitoring;

  • – General exhaust fans;

Electrical main distribution plant monitoring;

Fire suppression plant monitoring;

Disabled person call system:

call stations;

Call control panel