“Hilton Batumi” Casino and administration offices

“Hilton Batumi” Casino and administration offices 2015

Challenges:

❖ VAV based, casino space temperature control system, with advanced algorithm, maintaining space temperature and air quality, for comfortable climate support.

Works performed:

◆ HVAC Automation System:

Casino space temperature control, via VAV system;

Office spaces HVAC system monitoring and control;

2 AHUs – 10000m3 3 each, 1 AHU – 30000m3, with VAV, humidity and rotary heat recovery control functions;

33 VAV terminals, with integrated heating coil;

33 water 2-way valves;

21 VRF indoor units;

Multipoint space temperature sampling system;

Cookie Policy

Website uses cookies.