Trade center “Galleria Tbilisi”

Trade center “Galleria Tbilisi” 2019

Challenges:

❖ Car park CO monitoring and control system – precise carbon monoxide sampling and integration with ventilation system;

Works performed:

◆ Building Automation System. Automation of. Automation of:

► Ventilation system – 15 AHU’s;

► Water boiler plant – 3 NG water boilers, 1.5MW each;

►Chiller plant – 4 air to water chillers, 600 KW each;

► DHW plant – 2 water boilers, 1000 liter each; each;

► Water circulation and pressurization plants/stations – 30 pumps;

► Water reservoir system – DW and fire suppression reservoirs;

► Fire suppression pump station;

►2 VRF systems;

►Car parking CO control system;

► Elevator monitoring system;

Fire detection System:

►600 smoke and heat detector;

► 15 canal airduct smoke detectors;

► 4 beam detection system;

► 95 manual call points;

◆ Voice evacuation system:

►350 ceiling and wall speakers;

► 6 power amplifiers;

► Audio control module;

◆ Electricity and water metering system: -Electricity and water metering system, on 60 users, with centralized management.

Cookie Policy