“Stamba” hotel and coworking center
“Stamba” hotel and coworking center - Tbilisi 2019-2024
Challenges:
❖ Coworking space temperature and air quality control system – 60 VAV terminals, 70 temperature and Carbon dioxide (CO2) transducers and AHU is connected to one, centralized monitoring and control center, for safe, stable, comfortable and energy saving operation of the building. Complete fast compensation of space air parameters, in simultaneous high demand occurrence condition, supporting productive working environment;
❖ System quiet operation was one of the main challenges of this project;
Works performed:
◆ Fire Alarm System:
– Smoke and heat detectors;
– Canal airduct smoke detectors;
– Manual call points;
– FCP with remote control panel;
► 4fire zone separation doors;
– Aspiration smoke detection subsystems;
– Beam detection subsystem;
◆ Voice evacuation system:
– Loudspeakers;
– Power amplifiers;
– Audio control module;
– Enunciation panel;
◆ Building Automation System. Automation of. Automation of:
– Space temperature and CO2 sampling points;
– Giant AHU – 37 000m3, with VAV function;
– VAV terminals
Space temperature and CO2 sampling points;
◆ Disabled person call system:
– call stations;
– Call control panel;