“Rooms Batumi” hotel
“Rooms Batumi” hotel 2023-2024
Challenges:
❖ 190 FCUs integration in guestroom occupancy control system, for advanced energy saving and comfort level;
❖ Hotel kitchen ventilation control system – airflow demand control, via VAV dampers and modulated exhaust fans, based on air differential pressure sensor readings, for quiet, energy efficient and comfortable operation;
Works performed:
◆ HVAC System:
► Air duct system for 15000m2 area;
► 190 pcs 4 pipe FCUs;
► 12 AHUs, 10000m3 each, with plate heat recovery unit, advanced humidity control;
► General ventilation system;
► 14 general exhaust fans;
► 2 pressurization, 4 smoke exhaust fans;
► 22 smoke exhaust dampers;
► 320 fire dampers;
► Electricity:
► 800 KVA Genset
► 2 HV transformers – 1200KVA each;
► 8 main distribution boards;
► 123 guestrooms;
► 2 conference rooms;
► 2 kitchens;
► 150 other consumers;
► 1200 lighting points;
► 45 exit signs;
► Sockets, switches and motion sensors;
◆ Plumbing:
► 123 Guestroom and 80 other premises heating & cooling water supply and drainage;
► General and fire suppression water pump stations;
► General and fire suppression water reservoirs – 4 pieces;
► Heating and cooling water distribution system on more than 400 consumers;
► Rainwater collection and drainage system;
► Kitchen wastewater fat separator;
◆ Fire Alarm System:
► 390 smoke and heat detector;
► 30 canal airduct smoke detectors;
► 60 manual call points;
► FCP with remote control panel;
► 2 pressurization, 4 smoke exhaust fans;
► FCP with remote control panel;
► 4 fire zone separation doors;
► 3 aspiration smoke detection subsystems;
► Cable based Heat detection subsystem;
► Server room fire suppression system;
► Kitchen hood fire suppression system;
◆ Voice evacuation system:
► 200 loudspeakers;
► 3 power amplifiers;
► Audio control module;
► Enunciation panel;
► Building Automation System Automation of:
► HVAC – 12 AHUs, 190 FCUs;
► DHW plant control;
► 3 pieces of “6 pipe” heat pumps, with energy recovery and DHW “buster” units;
► Hot water circulation plant – 14 pumps;
► Chilled water circulation plant – 16 pumps;
► Water pressurization station – 3 pumps;
► General and Fire suppression water reservoir control and monitoring;
► 14 general exhaust fans;
► 2 Gensets monitoring;
► Fire suppression plant monitoring;
► Disabled person call system:
► 4 call stations;
► Call control panel;
◆ LAN structural cabling, on 650 user points;