“National Gallery of Georgia”
“National Gallery of Georgia” Also known as the “Blue Gallery”- Tbilisi 2011
Challenges:
❖ Exhibition, store and restoration space precise temperature and humidity sampling/control, via specially designed control algorithms, for safe and stable space organization, as it defined for the exhibits, recognized as a national treasure;
Works performed:
◆ Building Automation System. Automation of. Automation of:
– HVAC;
– Air to water chillers;
– Water boilers – 1000KW each;
– Chilled water circulation plan;
– Heating water circulation plant;
– Exhibition, exhibit store and restoration space temperature/humidity sampling system;
– Water pressurization station;
– General and Fire suppression pump station monitoring;
– General exhaust fans;
– Gensets monitoring.