“Holiday INN Tbilisi”
“Holiday INN Tbilisi” hotel 2010-2011
Challenges:
❖ Staircase pressurization system – staircase differential pressure (50Pa max.) maintenance system for 23 floor building, in case of fire;
Works performed:
◆ Fire detection System:
– smoke and heat detectors;
– canal airduct smoke detectors;
– manual call points;
– FCP with remote control panel;
– pressurization & smoke exhaust fans;
– smoke exhaust dampers;
– fire zone separation doors;
– elevator double safety ;
– Boiler room NG leakage detection subsystem;
◆ Voice evacuation system:
– loudspeakers;
– power amplifiers;
– Audio control module;
– Enunciation panel;
◆ Building Automation System. Automation of. Automation of:
– HVAC – 13 AHUs, 32 FCUs;
– DHW plant control;
– Water pressurization station;
– General and Fire suppression water reservoir control and monitoring;
– General exhaust fans;
– Gensets monitoring;
– Fire suppression plant monitoring;
◆ Disabled person call system:
– call stations;
– Call control panel;