“Holiday INN Tbilisi”

“Holiday INN Tbilisi” hotel 2010-2011

Challenges:

❖ Staircase pressurization system – staircase differential pressure (50Pa max.) maintenance system for 23 floor building, in case of fire;


Works performed:

◆  Fire detection System:

860 smoke and heat detector;

25 canal airduct smoke detectors;

125 manual call points;

FCP with remote control panel;

4 pressurization, 6 smoke exhaust fans;

► 60 smoke exhaust dampers;

50 fire zone separation doors;

► 4 elevator double safety ;

Boiler room NG leakage detection subsystem;

◆  Voice evacuation system:

400 loudspeakers;

6 power amplifiers;

Audio control module;

Enunciation panel;

◆  Building Automation System. Automation of: Automation of:

HVAC – 13 AHUs, 32 FCUs;

DHW plant control;

Water pressurization station – 4 pumps;

General and Fire suppression water reservoir control and monitoring;

10 general exhaust fans;

2 Gensets monitoring;

Fire suppression plant monitoring;

◆  Disabled person call system:

4 call stations;

Call control panel;