Challenges:
❖ Staircase pressurization system – staircase differential pressure (50Pa max.) maintenance system for 23 floor building, in case of fire;
Works performed:
◆ Fire detection System:
► 860 smoke and heat detector;
► 25 canal airduct smoke detectors;
► 125 manual call points;
► FCP with remote control panel;
► 4 pressurization, 6 smoke exhaust fans;
► 60 smoke exhaust dampers;
► 50 fire zone separation doors;
► 4 elevator double safety ;
► Boiler room NG leakage detection subsystem;
◆ Voice evacuation system:
► 400 loudspeakers;
► 6 power amplifiers;
► Audio control module;
► Enunciation panel;
◆ Building Automation System. Automation of: Automation of:
► HVAC – 13 AHUs, 32 FCUs;
► DHW plant control;
► Water pressurization station – 4 pumps;
► General and Fire suppression water reservoir control and monitoring;
► 10 general exhaust fans;
► 2 Gensets monitoring;
► Fire suppression plant monitoring;
◆ Disabled person call system:
► 4 call stations;
► Call control panel;