“Holiday INN Tbilisi”

“Holiday INN Tbilisi” hotel 2010-2011

Challenges:

❖ Staircase pressurization system – staircase differential pressure (50Pa max.) maintenance system for 23 floor building, in case of fire;

Works performed:

◆ Fire detection System:

– smoke and heat detectors;

– canal airduct smoke detectors;

– manual call points;

– FCP with remote control panel;

– pressurization & smoke exhaust fans;

– smoke exhaust dampers;

– fire zone separation doors;

– elevator double safety ;

– Boiler room NG leakage detection subsystem;

◆ Voice evacuation system:

– loudspeakers;

– power amplifiers;

– Audio control module;

– Enunciation panel;

◆ Building Automation System. Automation of. Automation of:

– HVAC – 13 AHUs, 32 FCUs;

– DHW plant control;

– Water pressurization station;

– General and Fire suppression water reservoir control and monitoring;

– General exhaust fans;

– Gensets monitoring;

– Fire suppression plant monitoring;

◆ Disabled person call system:

call stations;

Call control panel;