“Episode Tbilisi” hotel
“Episode Tbilisi” hotel 2022
Works performed:
◆ Fire detection System:
– Smoke and heat detectors;
– Canal airduct smoke detectors;
– Manual call points;
– FCP with remote control panel;
– Pressurization, Smoke exhaust fans;
– Smoke exhaust dampers;
– 6 fire zone separation doors;
◆ Voice evacuation system:
– Loudspeakers;
– Power amplifiers;
– Audio control module;
– Enunciation panel;
◆ Building Automation System. Next
– Automation of.
– HVAC – AHUs, indoor VRV units;
– DHW plant control;
– Water pressurization station;
– General and Fire suppression water reservoir control and monitoring;
– General exhaust fans;
– Fire suppression plant monitoring;
◆ Disabled person
– call system:
– call stations;
– Call control panel;