“Episode Tbilisi” hotel

“Episode Tbilisi” hotel 2022

Works performed:

Fire detection System:

– Smoke and heat detectors;

– Canal airduct smoke detectors;

– Manual call points;

– FCP with remote control panel;

– Pressurization, Smoke exhaust fans;

– Smoke exhaust dampers;

– 6 fire zone separation doors;

Voice evacuation system:

– Loudspeakers;

– Power amplifiers;

– Audio control module;

– Enunciation panel;

Building Automation System. Next

– Automation of.

– HVAC – AHUs, indoor VRV units;

– DHW plant control;

– Water pressurization station;

– General and Fire suppression water reservoir control and monitoring;

– General exhaust fans;

– Fire suppression plant monitoring;

Disabled person

– call system:

– call stations;

– Call control panel;