East Point Sopping Center -Tbilisi

East Point Sopping Center -Tbilisi 2014

Challenges:

❖ Establish single BACnet IP automation network, for 4 blocks of the shopping center;

Works performed:

◆ Building Automation System. Automation of. Automation of:

-AHUs, RTUs, FCUs, exhaust fans;

– Water boilers, 1,5MW each;

– Hot water circulation plant on 15 pumps, 12 motorized valves;

– DHW production plant, Water boilers, 1,5 KL each, Pumps;

– Air to water chillers, 0,6 MW each;

-A dry cooler;

– Chilled water circulation plant, 18 pumps, 11 motorized valves;

– Floor heating plant, a 3-way valve, 4 motorized valves;

◆ Plumbing system automation:

– Water pressurization stations, 3-5 pumps each;

– Waterfall plants, with 4-5 water pumps;

– Water reservoirs, on 20-30 m3 storage;

  • – Fire suppression stations, Ppumps;

◆ Smoke control system:

– Fire dampers;

– Smoke dampers;

– Pressurization and exhaust fans;

◆ Water metering system:

– Water meters, connected to centralized metering system via M-bus network;