East Point Sopping Center -Tbilisi
East Point Sopping Center -Tbilisi 2014
Challenges:
❖ Establish single BACnet IP automation network, for 4 blocks of the shopping center;
Works performed:
◆ Building Automation System. Automation of. Automation of:
-AHUs, RTUs, FCUs, exhaust fans;
– Water boilers, 1,5MW each;
– Hot water circulation plant on 15 pumps, 12 motorized valves;
– DHW production plant, Water boilers, 1,5 KL each, Pumps;
– Air to water chillers, 0,6 MW each;
-A dry cooler;
– Chilled water circulation plant, 18 pumps, 11 motorized valves;
– Floor heating plant, a 3-way valve, 4 motorized valves;
◆ Plumbing system automation:
– Water pressurization stations, 3-5 pumps each;
– Waterfall plants, with 4-5 water pumps;
– Water reservoirs, on 20-30 m3 storage;
- – Fire suppression stations, Ppumps;
◆ Smoke control system:
– Fire dampers;
– Smoke dampers;
– Pressurization and exhaust fans;
◆ Water metering system:
– Water meters, connected to centralized metering system via M-bus network;