David the builder Kutaisi International Airport
David the builder Kutaisi International Airport - 2021-2022
Challenges:
❖ Aspiration fire alarm system – very fast smoke detection, for enhanced life safety level;
❖ “Cooled floor” system, for effective heat rejection, through precise temperature, dew point, humidity control, allowing stable and comfortable building operation;
Works performed:
◆ Fire detection System:
– Smoke and heat detectors;
– Canal airduct smoke detectors;
– Manual call points;
– FCP with remote control panel;
– Smoke aspiration plants;
◆ Building Automation System:
– HVAC –AHUs,FCUs, convectors, floor heating/cooling collectors;
– Temperature and Humidity control;
– Light control panel;
– Fire suppression plant monitoring;
– Flood control system
◆ Network Infrastructure:
– LAN points:
– WIFI points;
– Centralized Clock points;
◆ Video surveillance System:
– Hi res video surveillance cameras;
– Advanced monitoring center;
◆ Access control – with central monitoring system;