David the builder Kutaisi International Airport

David the builder Kutaisi International Airport - 2021-2022

Challenges:

❖ Aspiration fire alarm system – very fast smoke detection, for enhanced life safety level;

❖ “Cooled floor” system, for effective heat rejection, through precise temperature, dew point, humidity control, allowing stable and comfortable building operation;

Works performed:

◆ Fire detection System:

650 smoke and heat detector;

10 canal airduct smoke detectors;

75 manual call points;

FCP with remote control panel;

6 Aspiration smoke detection subsystems;

◆ Building Automation System:

HVAC – 10 AHUs, 62 FCUs, 41 convectors, 34 floor heating/cooling collectors;

Temperature and Humidity control;

Light control panel;

Fire suppression plant monitoring;

Flood control system

◆ Network Infrastructure:

4000 LAN points:

50 WIFI points;

30 Centralized Clock points;

◆ Video surveillance System:

300 hi res video surveillance cameras;

Advanced monitoring center;

Access control – 45 doors, with central monitoring system;

Cookie Policy

Website uses cookies.