Challenges:
❖ Aspiration fire alarm system – very fast smoke detection, for enhanced life safety level;
❖ “Cooled floor” system, for effective heat rejection, through precise temperature, dew point, humidity control, allowing stable and comfortable building operation;
Works performed:
◆ Fire detection System:
► 650 smoke and heat detector;
► 10 canal airduct smoke detectors;
► 75 manual call points;
► FCP with remote control panel;
► 6 Aspiration smoke detection subsystems;
◆ Building Automation System:
► HVAC – 10 AHUs, 62 FCUs, 41 convectors, 34 floor heating/cooling collectors;
► Temperature and Humidity control;
► Light control panel;
► Fire suppression plant monitoring;
► Flood control system
◆ Network Infrastructure:
► 4000 LAN points:
► 50 WIFI points;
► 30 Centralized Clock points;
◆ Video surveillance System:
► 300 hi res video surveillance cameras;
► Advanced monitoring center;
◆ Access control – 45 doors, with central monitoring system;