Axis Towers – Tbilisi

Axis Towers - Tbilisi 2021-2022

Challenges:

❖ Firemen smoke control system with auxiliary override panel – supporting firefighting staff to intervene in smoke control logic, in critical situations, enhancing life safety level for building inhabitants;

❖ Heating and chilled water plant capacity control, for advanced energy saving level.

Works performed:

◆ Building Automation System. Automation of. Automation of:

– Ventilation system;

– Water boiler plant – NG water boilers, 0.5-1.5MW;

– Chiller plant – air to water chillers, 1.5MW each;

– DHW plant control;

–Water circulation and pressurization plants/stations ;

– Water reservoir system – DW and fire suppression reservoirs;

– Fire suppression stations, Pumps;

◆ Centralized Smoke control System – 130 fire and smoke dampers, 30 pressurization and exhaust fans, 35 air differential pressure maintenance units;