Axis Towers – Tbilisi

Axis Towers - Tbilisi 2021-2022

Challenges:

❖ Firemen smoke control system with auxiliary override panel – supporting firefighting staff to intervene in smoke control logic, in critical situations, enhancing life safety level for building inhabitants;

❖ Heating and chilled water plant capacity control, for advanced energy saving level.

Works performed:

◆ Building Automation System. Automation of. Automation of:

Ventilation system – 12 AHUs, 20000-30000m3/h;

Water boiler plant – 6 NG water boilers, 0.5-1.5MW;

Chiller plant – 2 air to water chillers, 1.5MW each;

DHW plant – 3 water boilers, 1500 liter each;

Water circulation and pressurization plants/stations – 50 pumps;

Water reservoir system – DW and fire suppression reservoirs;

Fire suppression pump station;

◆ Centralized Smoke control System – 130 fire and smoke dampers, 30 pressurization and exhaust fans, 35 air differential pressure maintenance units;

Cookie Policy

Website uses cookies.