Challenges:
❖ Firemen smoke control system with auxiliary override panel – supporting firefighting staff to intervene in smoke control logic, in critical situations, enhancing life safety level for building inhabitants;
❖ Heating and chilled water plant capacity control, for advanced energy saving level.
Works performed:
◆ Building Automation System. Automation of. Automation of:
►Ventilation system – 12 AHUs, 20000-30000m3/h;
► Water boiler plant – 6 NG water boilers, 0.5-1.5MW;
►Chiller plant – 2 air to water chillers, 1.5MW each;
► DHW plant – 3 water boilers, 1500 liter each;
► Water circulation and pressurization plants/stations – 50 pumps;
► Water reservoir system – DW and fire suppression reservoirs;
►Fire suppression pump station;
◆ Centralized Smoke control System – 130 fire and smoke dampers, 30 pressurization and exhaust fans, 35 air differential pressure maintenance units;