East Point Sopping Center
East Point Sopping Center -Tbilisi 2014
Challenge(s):
❖ Establish single BACnet IP automation network, for 4 blocks of the shopping center;
Works performed:
◆ Building Automation System Automation of:
► 8 AHUs, 22 RTUs, 33 FCUs, 21 exhaust fans;
►3 water boilers, 1,5MW each
► Hot water circulation plant on 15 pumps, 12 motorized valves;
►DHW production plant, 3 water boilers, 1,5 KL each, 7 pumps; each, 7 pumps
►4 air to water chillers, 0,6 MW each;
►A dry cooler;
►Chilled water circulation plant, 18 pumps, 11 motorized valves;
►Floor heating plant, a 3-way valve, 4 motorized valves
◆ Plumbing system automation:
►4 water pressurization stations, 3-5 pumps each;
►2 waterfall plants, with 4-5 water pumps;
►3 Water reservoirs, on 20-30 m3 storage;
3 Fire suppression stations, 9 pumps;
◆ Smoke control system:
►60 fire dampers;
►34 smoke dampers
►22 pressurization and exhaust fans;
◆ Water metering system:
►51 water meters, connected to centralized metering system via M-bus network;