“Lanceti” Hospital

“Lanceti” Hospital 2014

Challenges:

❖ Was simple, nice project, without special challenge.

Works performed:

◆ HVAC Automation System:

– AHUs – 8000m 3each, equipped with DDC controllers;

BACnet MSTP communication network;

Centralized operator workstation, with BAS front end;